Checklist Before a Kitchen Equipment Consultation
Prepare seven things: business concept, main menu, peak-hour portions, kitchen layout and size, power, gas, water and ventilation, existing equipment, and target opening date. This data makes recommendations more accurate and the discussion shorter.
7 things to prepare
- Business concept: hotel, restaurant, café, bakery, catering or central kitchen, and target customers
- Main menu: the dishes that sell most and how they are cooked
- Capacity: portions at peak hour and growth plans
- Space: layout or photos of the kitchen, dimensions and access for equipment
- Utilities: available power, gas, water and ventilation
- Existing equipment still in use
- Target opening date
Why this data matters
Menu and peak-hour portions decide the type and number of units. Space and utilities decide whether they can be installed without major works. Without this data, recommendations risk being the wrong size.
Not complete yet? No problem
Send what you have. We will fill in the rest together during the consultation, including a site visit or demo.
Frequently asked questions
Do I need a technical drawing?
Not necessarily. Photos and rough dimensions are enough for a first discussion.
What if the kitchen is not built yet?
Even better to consult early, so power, gas, water and ventilation points are planned around the equipment.
Can I see a demo before buying?
For many units, yes. The Certechs team will arrange one based on your menu.
Need Technical Equipment Consultation?
Discuss operational requirements, flow rates, capacities, and site layout directly with Certechs engineering specialists.